Kaisten bridge renovation
August 09, 2016
ERNE renovated two bridges in Kaisten. The work took place under challenging conditions: A half-sided road closure was organized in two phases to maintain the flow of traffic as best as possible.


The refurbishment included various specialized structural protection methods. In addition to classic concrete refurbishment, CFRP slats were used to reinforce the bridge structures. Old concrete surfaces were carefully prepared using HDW work.
